The misleading narratives about Harborplace

In an unprecedented well coordinated effort of selling the notion to the general public that Baltimore would be better off if MCB's HarborPlace renderings became reality, the Mayor, the local councilman and the developer himself spin misleading or outright deceptive narratives.
Before passing the three bills that lift all existing zoning restrictions and before handing the key for HarborPlace to a private for-profit developer, these false narratives need to be set straight:
MCB Rendering with new high-rises to the right
and "sail" building to the left



Myth: Malls are dead and the pavilions are obsolete

This narrative tries to establish as a fact that the Rouse pavilions can't be saved because they constitute an obsolete retail model that has now run its course. 

What is true is that the pavilions never were designed as malls in the first place, but as 'festival markets". Unlike malls they weren't large, nor surrounded by parking lots, nor were they inward looking.There were no anchor stores or national chains stores that make actual malls look like they were cloned. Instead Jim Rouse's pavilions were filled with local retail establishments, were carefully managed and included an ongoing series of entertaining activities to draw people.  Several restaurants were directly oriented towards the water with outdoor terraces. Second floor food vendors shared outdoor eating terraces as well. The  failure of the pavilions came when the Rouse company sold them to successors who paid no attention to  carefully curated retail activities or upkeep. 

In fact, the original concept of the pavilions closely resembles the currently en-vogue food halls and markets that MCB also envisions for the first floor of their highrises. In other words, MCB wants to replicate what the original the pavilions did so well. Meanwhile MCB begun to bring local retail back into the pavilions and has already succeeded in partly reviving them from their previous slumber. The arrangement of the pavilions with their terraces towards the promenade is architecturally so successful that it has been replicated many times, most recently with almost the same exact details and dimensions in DC latest waterfront development, the Wharf. In fact Baltimore's HarborPlace served for decades as a global model for waterfront revitalization. (See this PBS documentary).

Myth : Only old people nostalgia stands in the way of reinventing  HarborPlace

This narrative suggests that only some old people who remember HarborPlace's heyday cling nostalgically to their memories of Rouse and Schaefer and can't tolerate change specially change towards more equity. This, too misses the mark. In fact, both the much revered former HarborPlace developer, the late Jim Rouse, and the late Mayor Donald Schafer preached all along that the Inner Harbor to stay successful it has to continually change and evolve. To that end the Aquarium was extended, the Science Center added and the Power Plant converted into restaurants and entertainment. The visitor center was added, the Constellation received a brand-new museum and access building and Rash Field was redesigned with a second phase still to come. The Christmas Village was added to the seasonal attractions, as was the much loved ice rink. Various events such as the book fair and light city came an went. The promenade received new lighting and for a while we even had a fancy water taxi. The Aquarium has additional attractions planned for this year. In other words, the City and the Waterfront Partnership made wise investments, especially the very popular skate park and playground. 

All that was done with the mindset of the Inner Harbor as Baltimore's Commons, open to all and all happened without violating the zoning rules or the Harbor masterplan that conceived the Inner Harbor as a large public space with some generally low height attractions sprinkled within.

Would a new attraction hurt? Certainly not, especially one that would serve a public purpose such as the pedestrian bridge from Federal Hill to Harbor East once proposed as part of the Harbor 2.0 plan. Much less clear is that an eye catching office building such as the stepped "Sail" building on MCB's renderings would serve a public purpose or whether walking up in front of those terraced commercial uses would truly be an attraction that lasts.  The failed Columbus Center on Pier 5 should be a warning. Offices and event venues don't make an attraction, no matter how dressed up they come. It seems that the Aquarium still serves the purpose of architectural landmark quite well. 
The reality is that nobody ever clamored for high-rise apartments or an office building at HarborPlace  in any of MCB's public listening sessions or "dinners with a developer" and that the proposed developments will do nothing to increase equal access. Opposition to the proposed plans cuts across age, gender and race.

Myth: MCB came in as a savior and we should be glad for it

True, the pavilions were neglected and languished for too long, first under bad management and then in receivership, burdened by significant debt and produced ongoing deficits. Buyers were not exactly lining up to buy them. To his credit the Mayor as owner of the land under the pavilions paid attention to the situation. But in the excitement he may have skirted proper procedure.
“I’ve been known to keep secrets, but the hardest one that I had to keep is the work that my law department and BDC and others were doing from the first day I got in office to make sure that we didn’t let Harborplace stay or get into other out-of-town hands. We made sure that Harborplace got into the hands of a West Baltimore boy who understands and knows Baltimore like no one else.”  (Mayor Brandon Scott, 10/30/23 as quoted by Ed Gunts in the Fishbowl)
The details here remain murky, but from what we know now, one can safely say that interest in the pavilions would have been sky high if they would have been publicly offered with all the promises MCB apparently received: 
  •  the City would lift all height restrictions, 
  • open this prime waterfront real estate for apartments, offices and parking
  • offer a footprint that can exceed that of the pavilions by 40%. 
  • plus, as the cherry on the cake,  one million of City dollars towards a privately conducted public engagement process. 
In a true competitive setting MCB may not have been the obvious choice for unfettered rights to one of the most prominent waterfront locations in the entire country. Yes, MCB is a successful minority developer, born and raised in Baltimore. The owner, David Bramble still lives near North Avenue and has moved along several other difficult redevelopment sites in the City.  Yes, everybody likes David Bramble, as become obvious at the Planning Commission hearing, and Baltimore surely needs to support minority led businesses. Bramble also assembled an A-team of consultants. Still, MCB never did a development of the proposed size and complexity before, and David Bramble is a self proclaimed "spreadsheet guy" and not a visionary planner who routinely reimagines strategic downtown areas. Given Baltimore's rich history of broken developer promises, leaders should be wise enough to follow a proper process, do all due diligence, install backstops, insurances and alternatives.

Myth: The apartments are needed to pay for the project and to bring people to HarborPlace

MCB is proposing 900 apartments in two towers plus two more large structures that would contain offices and states that these many additional uses are necessary to bring life to HarborPlace and downtown and to sustain the restaurants and markets. The overall notion that more people living downtown would result in more people walking the streets and the promenade adding demand sounds convincing on first blush. But at least three arguments speak against this reasoning:
  • considering how many thousand people have already moved to downtown in recent years without stemming the ongoing departure of retail and restaurants, one has to wonder if the effect is that straight forward. 
  • And as the fellow developer David Tufaro remarked on WBAL radio, Baltimore's Inner Harbor creates a perfect three sided space that in many ways acts like Baltimore's Central Park. Central gathering spaces bestow value on all surrounding uses. Putting apartments into the valued space itself diminishes its value
Over the history of New York City’s mayors — whether corrupt, decent, inept or quite capable — not one conspired with a private developer to permit residential development in {Central] park itself. Not one would dare. (Rebecca Hoffberger, founder of the Visionary Art Museum in a letter to the SUN)
  • Lastly, what exactly are these apartments supposed to pay for? MCB stated that the repairs to the promenade, the connection of McKeldin Plaza and the street reconfiguration would have to be paid from public resources and won't be funded by him. So is he saying that those 900 units and the offices are needed to pay for the new market spaces and restaurants?  That appears not very plausible if one looks at Cross Street Market, Broadway Market and R-House as operations that are not funded by apartments. At least not by apartments directly above them.  If MCB wants to fund the new HarborPlace markets with apartments, he could do this with his other Inner Harbor properties across Pratt Street. 
Myth: Unprecedented public input and an international design competition

Councilman Costello praises MCB for "unprecedented" public outreach that included even advertisements on the side of buses, "listening sessions" and exclusive "dinners with the developer". What he didn't mention was that the City promises to pay for all this. When recently retired Morgan architecture professor Leon Bridges testified against the project at the Planning Commission asking for a public international design competition as a way to get the best professional design for a HarborPlace revival Councilman Costello assured him that MCB had conducted just such a competition. Indeed, MCB had secretly invited three international firms to produce designs for one building and selected the Danish firm 3XN that had sketched out what is now known as the "Sail" building. However this process is a far cry from the highly regulated international design competitions Bridges referred to. All MCB's competition proved was that he proceeded with his designs long before the listening sessions ended and that those sessions hardly informed the designs he presented.
 
Conclusion

Whether one likes the bold design depicted on MCB's renderings or not, the project should not be promoted on the basis of deceptive or even false narratives. 
Politicians lining up in support of MCB plans
at the unveiling of the plans in 2023.

 

Neither the Mayor, nor the Planning Commission, or the City Council should be willing to hand over HarborPlace before a proper professional vetting of the financial conditions, the urban design, the market conditions, the practicality of the towers, and the long-term fit for downtown. It should not simply be left to the voters to put some reason into the process via a November referendum. Full and accurate information and a masterplan are needed now.

The custodians of this premier piece of real estate  should not be so rash with expressing their full support for a plan that almost all of them saw only hours before the developer revealed it to a flabbergasted public.  They should wonder why there is hardly any design or planning professional who shares their excitement and consider the possibility that they may come to regret their haste and willingness to be pushed over by narratives that don't hold the water. 

Klaus Philipsen, FAIA

1-16-24: A correction was made relative to the uses in the "Sail" building. According to MCB the uses in that building include "a marketplace on the first two floors and [..]restaurant, venue and commercial opportunities on the upper levels".

See also Dan Rodricks SUN column of Sunday Jan 14,24

Friday, January 5, 2024

"Light rail killed Howard Street" - an urban legend debunked

 To some people, the crossroads of Howard and Lexington streets have become a trash bin of mistakes. But others see the collection of ideas centered in the intersection as something else: A historic showcase of our commitment to keep trying until we get it right. Eventually, we will. (Gilbert Sandler, 1998 SUN)

Now that Light Rail is up and running again it is time it is time to bury an urban legend, especially in an election year. Urban legends are by definition falsehoods. Few have been more persistent than the one that light rail killed Howard Street.  The implication that Howard Street is dead is false as well.

Howard Street at Lexington Street with turned "candy cane" lights
and elevated large light arches. (Photo: Kittelson)

Let's set the record straight on both counts:  Even though proving that Howard Street isn't dead would also prove that light rail couldn't have killed it, let's go in chronological order. 

Way back in 1986 Howard Street had ben transformed into a transit mall, candy cane shaped light poles and big arches and all. And here is the kicker: Howard Street was transformed into a bus transit mall to save it, not to kill it! Light rail was not on anybody's mind at that time but the closure of two of four department stores and the decline of Baltimore's historic downtown shopping district was very much on people's mind. 

As early as the 1960s and 1970s several cities experimented with bus transit malls as a fix that would bring additional foot traffic to the shops . Vancouver, Chicago, Portland, Seattle and Denver may be the most known examples. Some of these transit malls were busts and had only a short life (Chicago, Baltimore), others persist to this day (Vancouver, Denver, Seattle).

Howard Street in its glory days, a mess of cars, trolleys and
throngs of pedestrians (SUN Archive)
The transit mall was an early attempt to wrestle streets from the dominance of the automobile and give pedestrians and surface transit more space. Most transit malls that survived are some type of hybrid in which cars may operate during certain hours or in a very limited way. 

In Baltimore Light rail came into the picture a few years after the Howard Street transit mall had opened to much fanfare and wide bricked sidewalks, plenty of custom lights and extra big bus shelters. 

Light Rail was less not seen as an another way to save Howard Street but as a tool to allow a downtown ballpark. But the downtown ballpark was just another big idea of then Mayor Schafer to boost downtown by bringing more people to  downtown. This was in line with Schaefer's "Baltimore Renaissance" which had begun with Charles Center and Inner Harbor and was continued with the Civic Center, the Convention Center and Oriole Park. 

Saving downtown shopping with fancy lights
did not work out (Photo: SUN)

Clearly, a downtown stadium couldn't be surrounded by the usual sea of parking on display at Memorial Stadium, that wouldn't help downtown and isolated the stadium. With a direct rail transit connection the suburban parking dystopia could be avoided. 

Transit planners looked at running LRT on Howard, Eutaw, Paca or even Charles Streets.  Howard Street was deemed to serve the stadium best and with being already a transit mall promised the least disruption from construction. 

To avoid digging up the entire street once again, designers simply tried to fit the trains in with the refurbished streetscape of the transit mall. The decorative custom "candy cane lights" were turned  by 180 degrees to allow the trains to pass, The two large arches spanning the entire street were lifted by 2 feet so the trains plus overhead wires would fit through.  The large custom made bus shelters got a new paint scheme and were re-used in place or sometimes moved to a slightly new location. The widened sidewalks between Saratoga and Mulberry Streets were left in place and the tracks curved accordingly.. 

And because neither merchants nor drivers had liked the bus-transit mall, the insertion of LRT was used as an opportunity to bring the cars back. With LRT Howard Street gained a continuous northbound car lane from Pratt Street to MLK and a southbound car lane from MLK to Centre Street. 

Some of the funky track and driving lane crossovers come from the attempt of reducing impacts to a minimum. Yes, to put the tracks down Howard Street had to be closed again for some time. But to set the record straight: Howard Street was on life support before the bus mall, before light rail and remained like that after light rail. Neither bus, nor rail nor cars and neither candy cane lights nor a downtown stadium would turn around Howard Street's decline. 

Also inaccurate: That designated transit lanes or tracks would provide expeditious transit travel. In reality trains are crawling along Howard Street because in spite of 30 years of promises the trains never got real signal priority at the intersections. So for the most part, they limp from block to block. 

2018 concept plan for Howard Street (MTA)

So no, light rail did not kill Howard Street, but it didn't save it either. The idea that more brick, more pedestrians and better lighting could save downtown shopping proved to be mistaken. Due to the high maintenance cost of all the custom lighting combined with the failure of revival the lights were eventually taken down again after only 20 years.

Decorative arches with lights, installed over Howard Street in the 1980s to restore long-lost twinkle, instead became a 20-year-running light bulb joke. Cut the laugh track – the city’s taking them down. “They won’t be missed!” Baltimore Development Corp. President M.J. “Jay” Brodie cheerfully wrote in an e-mail yesterday. (Baltimore SUN 2005)

Even the big custom shelters originally designed for buses fell out of favor and were in part replaced with smaller glass shelters.

Custom bus shelter as reused for light rail
(Photo MTA)

As late as 2018 MTA floated a $75 million plan to redo the parts of Howard Street that had the extra wide sidewalks yet again in order to straighten out the tracks. Alas the federal money for the plan didn't come through and the idea has been put on hold for now.

The rescue came from investment in buildings instead of the street.  

Howard Street never died and today it is in better shape than it has been in many years. The improvements came from the land use on both sides of the road, not from tinkering with the public right of way. The Arena got an upgrade, another developer was selected the Superblock who is promising actual development; the entire block 400 block of Howard Street has seen revitalization and rehabilitation on both sides and plenty new apartments have been built along and near Howard Street. 

The lesson is that neither a street fully devoted to cars, nor one fully devoted to buses, nor one dividing up the space between transit and cars can save downtown retail in a shrinking city. Baltimore's shrinking retail base has moved to the Inner Harbor, Harbor East, Canton and neighborhood "main" streets such as the Avenue in Hampden or Light Street in Federal Hill and struggles even there. Just witness the failing Gallery atrium mall and HarborPlace pavilions which most certainly were not killed by light rail.

Let's stop pointing the finger at transit when it comes to urban ills. The story of Howard Street should teach us the lesson that a only a healthy and stable city can support retail. And for a city to be healthy and stable it needs functioning transit. 

Klaus Philipsen, FAIA

Gilbert Sandler: Howard Street history


Wednesday, December 6, 2023

HarborPlace: How not to make a deal

 "The full weight of city government is ready to make this a reality. We won't stop until this project comes to fruition" (Mayor Brandon Scott)

In my previous article written right after David Bramble had pulled his giant HarborPlace rabbit out of the hat, I wondered how the Mayor could be so committed on a proposal that even insiders had known for only 48 hours. 

Brandon Scott and the Governor 
at the unveiling of theDesign
(Photo: Philipsen) 
The proposed project has been hotly debated ever since it was revealed with lots of smoke and mirrors and very little in terms of hard facts. There are fervent proponents, including the entire leading political class from Governor to Councilman, and there are ardent opponents. The pro crowd seems to be more powerful but smaller.  It is vying for the huge investment to turn the ailing HarborPlace around and bring jobs and energy to all of downtown. The opponents fear that the project would kill the goose that lays the golden eggs, i.e. it would ruin the Inner Harbor instead of rescuing it. 

Let's assume for a moment that the project would indeed be what the Mayor assumes when he wants "this project come to fruition" and that the program, the design and the execution by this team, lock-stock and barrel, would be the optimal choice. For sake of argument, let's set aside qualms about the high-rises or the question why giving a developer public parkland for for-profit development is the height of brilliancy. 

Proposed design: Rabbit out of the hat
(MCB rendering)

Three bills 0444, 0446 and 0448 introduced by councilman Costello are supposed to remove the obstacles on the path to success. The bills were heard by the Planning Commission on 11/30. A vote was postponed until 12/21 because of the difficulties to get the online participants to see the proceedings. 

This delay gives everyone a chance to mull this over. The bills are intended to create the zoning necessary to permit the proposed size of the project which cannot be built with the existing Urban Renewal Plan and current zoning in place. Because the plan includes parkland conversion, it requires a charter amendment, which has to go to referendum during the election in 2024. Planning Commission and Council approval are the necessary steps needed to place the issue on the ballot. 

For sake of argument let's further assume that the bills would pass all hurdles and voters would approve them next November. Will that get the project built as envisioned? Clearly not! A project of this magnitude doesn't materialize over night. But will the bills, which open the floodgates by removing all controls, ensure that the project doesn't veer off the rails? Unfortunately, no. The bills don't contain any assurances and safeguards for the project to happen as imagined. In other words, the removal of controls could yield outcomes that could potentially be vastly different from what Bramble's renderings show.  

No other places were such conditions would or should be installed are in progress or in sight right now. The necessary land transactions could be such a venue but it would be helpful to know now how that process would shape up. Once the horse it out of the barn without reigns, it will be much harder to get it back in. This laissez faire approach is astounding, since by owning the land and having very restrictive zoning in place, the City right now has full leverage to control what will happen.  

Redesigned Rash Field: unmitigated 
Success (Photo: Philipsen)

Bramble's MCB currently has only limited development rights on the two pavilions which the developer bought in foreclosure for a price that would have been at most 1/20th of the total cost the currently proposed project, even though the project is also burdened by "significant" unpaid debt as Councilman Costello pointed out to me. "That debt needs to be dealt with before anything can happen", Costello says. "Unlike when Harborplace was first built, this land is not being given away for free". To call this is a give-away would be "patently false", he maintains. 

Still, the City stands to give its entire leverage away including height, massing, use restrictions and limitations on the maximally allowable development footprint; all out the window should the bills pass. At this point it may be useful to recall that zoning was invented to protect the public. 

Let's just imagine a few scenarios how things wouldn't go as imagined:

  • MCB doesn't get the financing for the estimated $490 million and runs out of resources to build the project and either builds a stripped down cheap version or walks away all together
  • MCB decides to partner with another developer or sell the pavilions to another entity which has vastly different ideas and ideals. This new entity would obtain full rights without any meaningful restrictions
  • MCB is doing everything right but the City never finds the money to do the public improvements shown on Bramble's renderings. They alone are estimated by MCB to cost another $400 million. Likely Bramble's project would be dead in the water without the additional land that comes from realigning Light and Pratt Streets.
  • Alternatively, the City never gets around to doing the parks, streetscapes and new alignments but MCB finds a way to still stick their buildings on the land, i.e. Baltimore would get the buildings but not the amenities. A bad deal.

There are plenty of examples that demonstrate how difficult the process of getting a large project out of the ground is these days. For any developer. 

How “ the frame” works today: The tall guys stand back. 
(Photo Philipsen)

Port Covington is a valuable lesson. It tells us that beautifully drawn ambitious renderings can easily be tossed aside when circumstances require cheaper and more expeditious solutions, as long as they are are allowed within the framework of the deal. 

In the case of the Port Covington TIF commitment, the City put a slew of conditions in place, about the public promenade, community benefits and about streetscape standards which whatever developer is held to. And even with those conditions in place, the development will never look like the original renderings of Under Armour's headquarters. What is being under construction now is just a shadow of was once envisioned, even if that may be for the better in this case. 

Other examples of things not going to plan aplenty: Simply look at the arduous saga of Madison Park North, another MCB project now called Reservoir Square. It goes back as far as 2014, then under a different ownership. The project had many starts and stops and design changes along the way. Or take the two huge holes in the ground on Baltimore Street that developer Howard Brown has left behind after he demolished the Mechanic Theatre and, two blocks further west, another set of structures. Or look at the former News American site, that has sat as a parking lot on prime land right across from HarborPlace for 40 years. It is now also owned by MCB and destined for a high density development. MCB also owns the 10 story 1 East Pratt Street building, also right across from HarborPlace.

As with the Planning Department's design review panel UDAAP before, the MCB team showered the Planning Commission with all the might of a sales pitch, about the growth of MCB, about access, equity, inclusion and all the public input they received. Absent were the hard facts of a technical site plan showing current and future property lines and all the other facts and figures needed to assess such a complex project. But unlike UDAAP which asked the developer to come back with the right materials, the Planning Commission's delay was a technical mishap, they gave no indication that they objected to the missing details.

Bramble's central argument is that he needs all those apartments "to make the numbers work". This is a completely unsubstantiated argument. What size is needed to achieve what outcome? Bramble says he wants to redefine downtown and that Baltimore has to grow in order to thrive. Few would disagree. But not all of the growth has to be at HarborPlace. Downtown has added over 15,000 residents in recent years, the nearby 500' tall Light Street tower with 394 apartments included. None of them have rescued the two pavilions from their decline. That decline was not the fault of the structures but the result of blatant neglect and mismanagement by the previous owners.

By contrast, the redesigned Rash Field with its skateboard area, playground and overlook became a huge success Existing residents flocked there by the thousands, long before the only small building, a coffee shop even opened. Although I have no doubt that David Bramble has the best intentions and his courageous full-on engagement with an excellent design team is nothing but laudable, his main argument is circular. "I propose a giant project that costs a lot of money so I need unfettered permissions to fund it". One could easily argue that a much cheaper project that focuses on the public spaces and amenities would yield better outcomes.

Bramble's big is better argument would make sense if the large for-profit component would pay for the public improvements that his pretty pictures show, the Freedom Park, the streetscapes, floating wetlands and whatever else one can discover on the drawings (streetcars, some even discovered a cable car). But Bramble has made it very clear: His project won't'pay the public improvements.  Those $400 million would have to be paid by taxpayers. And no such amount is in sight.

The tall guy sits on the playing field. No room for tall ships.
The floating promenade and floating
wetlands make the water even smaller. (MCB 
Gensler rendering)

While the details are murky, it looks like public functions that come with MCB's buildings are limited to a first floor market (that, ironically would likely re-incarnate Jim Rouse's original visions for the pavilions as in Port Covington's envisioned market), possibly a green roof top garden and potentially the stepping gardens on the building called "the Sail" plus the dark tunnel space underneath it. 

So what does the public get for the big give-away of rules? This is mostly an unanswered question. Possibly nothing, or very little. Whatever it is, it isn't written into the bills. Maybe the worst case unintended scenario would be the Mechanic Theatre model in which the pavilions get demolished and nothing new gets built at all? 

The available documents don't explain which parts of Bramble's plans, if any, would depend on curb realignments of adjacent roadways and what the steps are that are necessary to make those happen.  Possibly without zoning restrictions towers could rise without that the land area grows thanks to narrower streets. 

Wouldn't the Mayor want to make sure that none of the bad scenarios could happen? 

To represent the public interest when it comes to dealing with savvy private developers, the City has the "full weight" of the administration, such as the Baltimore Development Corporation, the Planning Department and all the other departments such as Transportation.

  • What does BC-DOT say about cutting Light Street down in size and closing the dogleg connection to Calvert Street? 
  • What is the Planning Department saying which reportedly is preparing for a downtown masterplan into which Brambles stuff would have to fit? 
  • What is BDC's cost benefit calculation for the project? The Planning Commission never got to hear any of that because the departments never had the time or the facts to do a proper analysis. 

The comments included in the "staff report" of the Planning Department are limited to describing which restrictions are in place today and which would be lifted by the suggested bills. It would be nice to learn if any of the folks know something the public doesn't. But after the Commission's vote was delayed to December 21 due the City's inability to make their WebEx work for the 60 or so people waiting to participate online, neither Commission members nor the administration are allowed to discuss the matter in the interim. All this stands in very stark contrast to the analysis of the Port Covington project leading up to the City TIFF funds. Whatever scrutiny at the time was in large part the result of a big public outcry over Kevin Plank's project and the City support for it.

Our Planning Department and this Planning Commission is engaged in a dereliction of duty for not performing this role for the citizens of Baltimore. You should not even be holding this hearing unless it is to reject the entire plan and this process. The Bramble Plan is a classic case of the-cart-before-the-horse.” (Developer David Tufaro as quoted by Ed Gunts in the Baltimore Fishbowl)  

The process questions are key for the success of a reimagined HarborPlace. One would think everyone would agree, especially the City Council representing us, the citizens, the Planning Department advising the Planning Commission and the latter advising the Mayor. I don't think that any of these entities act in bad faith. However, they are either too mesmerized by MCB as the HarborPlace savior or their hands have been tied by the Mayor who wants to wave the project through as quickly as possible. Fact is that the departments have not weighed in with their expertise as they are supposed to.

These are big questions and they are urgent, even before one discusses the other big issue, namely why a private developer should be allowed to stuff massive development on land that, in part, is designated to be open park space in perpetuity. 

Current view from upper pavilion deck (Photo: Philipsen)

Finally, the last question which we set aside so far is the design question: Why the proposed project should be allowed to violate the fundamental design rules of the long established and successful Inner Harbor Masterplan?

It was created by Wallace Robert Todd half a century ago and, for the most part, stood the test of time. It established ground rules about space, urban design, the interaction of public and private and the visual connections to and from the Inner Harbor. 

That old masterplan established an "outer frame" along Pratt and Light Street which defined the space we call Inner Harbor today and which acts in its totality as Baltimore's "Central Park": Water, promenade, adjacent parks and all. It was for decades laying golden eggs.

 The Planning Commission chair noted at the beginning of the deliberations that the bills in question were about land use and not about design. These two things can't be separated. The proposed land use, massing and bulk will drastically change how we see the Inner Harbor, literally and figuratively. It will open up some new views and block many others. 

Bramble proposed to put his high-rises inside the "outer frame". This means he puts them right into "central park", or, in sports terms, inside the playing field that we call HarborPlace.  That Baltimore can play a bigger game on a smaller field is so far just a promise that is hard to believe.

Klaus Philipsen, FAIA

After the initial publication the text was slightly edited for clarity


Monday, October 30, 2023

Towers instead of Pavilions: An entirely different Inner Harbor

A future visitor would not recognize HarborPlace if  Bramble's radical proposal for HarborPlace would  become reality. His suggested design concept breaks all rules that are currently in place and guided the design of the area since its inception 50 some years ago.

The new skyline of the Inner Harbor as per Bramble's
design team

 The proposal departs from the original Harbor Masterplan of Wallace, Roberts Todd of the 1970s which defined an inner and an outer frame in which the inner structures had to be low with the exception of the World Trade Center. 

The proposals also is much more drastic than the never enacted  Inner Harbor 2.0 plan of Ayer Saint Gross of 2013. The design breaks the current 50' height limit by a factor of 6 or more and introduces residential use to zoning regulations that allow only public and commercial uses. It proposes underground parking where parking is prohibited and it radically shifts traffic patterns of what had become Baltimore's de facto at-grade freeways, Pratt and Light Street. In spite of complete streets legislation, the Baltimore City never dared to lay hands on the many lanes of those two mega streets. 

In fact, the suggestion to connect the land of McKeldin Plaza to the Inner Harbor and do away with the dogleg was the boldest suggestion of the Inner Harbor 2.0 Plan. Predictably traffic engineers shuddered from the mere suggestion of doing away with the dogleg that isolated McKeldin Plaza and subsequently nothing changed. Bramble's plan not only cuts Light Street's width in half but also puts the Red Line on Pratt Street along with just two narrow eastbound lanes divided by a green median from transit and an access lane to the northside properties. He already achieved that Pratt Street has become one of the official alignment options for the Red Line.

Bramble's boldness could be designated as Inner Harbor 7.0 for how far it veers from the status quo and the original approach of version 1.0.

This is unusual for Baltimore and has probably not been seen since Charles Center was conceived.

High powered support for MCB's proposal: Mayor, Governor and
Comptroller (Photo: Philipsen)

Even more astounding, then, is the Mayor's quasi endorsement of the plan at the unveiling when he, the Governor and many other public officials stood shoulder to shoulder with the developer. 

"The full weight of  city government is ready to make this a reality. We won't stop until this project comes to fruition" (Mayor Brandon Scott)

The Mayor hinted on the "many steps ahead", and some backlash will surely come. Also astounding was the absence of the Planning Director Chris Ryer. One would think that the urban design experts of  the Planning Department would be the chief advisors to the Mayor, given that the Inner Harbor is public land and designated as a park. In fact, in spite of workgroup meetings, the city's housing, planning and transportation departments appear to not have been a really integral part of the team that shaped the suggested design. True, the Planning widened the area available for Brambles investigations early on by including the adjacent streets, McKeldin Plaza and the land areas between the current pavilions and their neighbors. The Planning Director also insisted on added resilience to account for rising sea levels. That the added flexibility would result in so much more stuff to be built, though was probably not the intention. With all of Bramble's proposed new structures the Visitor Center and the World Trade Centers, both designed as freestanding solitaires, now feel hemmed in by their new neighbors. 

The proposed integration of McKeldin Plaza with
an event amphitheater building on the left and a
redesigned Pratt Street with Red Line
(Rendering: MCB)
One has to wonder what will happen to the public process in which existing regulations are usually changed, especially so drastically. Will the Planning Commission, the Planning Department and the City Council have more than a perfunctory voice in the review process after the Mayor and the Governor already embraced this design? 

Converting public open space into development areas requires a number of legal steps, even if they entail swaps and result in a net gain of open space as Bramble's calculations suggest.  Clearly, a process that would have started with a masterplan or framework would have been preferable over one that starts with a complete design.  

A participant at the reveal event who has a say in what happens along the waterfront, considers the drawings more aspirational and "philosophical", no matter how specific they look. Either way, one would hope that the plan will get a thorough review regarding design and regulations. 

The current regulations of the still valid Urban Renewal Plan mention a mandatory review process by a special group to be appointed. This may be superseded by the current day urban design and architecture review panel (UDAAP) which is excellent. UDAAP also reviewed the earlier suggestions for the pavilions submitted by then owner Ashkenazy tyat were never realized. 

 "All preliminary and final plans for Development Area 13 shall be subject to review and comment by an ad hoc Advisory Task Force (hereinafter called Task Force) which shall be established by the Commissioner of the Department of Housing and Community Development to provide citizen input into the design process for the improvements to be constructed within said Development Area.

Bramble hired a very reputable team of designers to develop the concept as presented: MCB Real

The amphitheater building and the office building
closing in on the WTC (rendering MCB) 
Estate invested in what they called an "international design competition for Pratt Street" that, according to Bramble, had massive international resonance but stayed completely hidden from public view. 

As a result of the competition he picked the Danish firm 3XN for the design of the Pratt Street stepped building called the "sail". The Baltimore landscape architect Unknown Studio designed all open spaces. Gensler's Baltimore office is the architect for the residential towers and the office cube. Co managing director and principal Vaki Mawema even got a spot at the podium at the design unveiling, which  is worth noting since unlike in Europe, here architects usually have to stand back behind the politicians.

"Baltimore's relationship with its waterfront continues to be an important aspect of our cultural identity and our livelihood.{...] The plan opens up our economy and our Inner Harbor." 

Additionally, BCT Design Group of Baltimore , Sulton Campbell Britt, STV Inc., Moffatt & Nichols, The Traffic Group, RK&K and Biohabitats have been retained for the project.

The most appealing aspects of the design concept, the connected park on what used to be McKeldin Park, the open space from the corner of Pratt and Light, as well as the road diets for those two streets, all require large public investments. A logical arrangement would be that the developer pays for these amenities as the price for the massive development rights he is receiving on public land.  However, that is usually not how things work in Baltimore. In fact, it is much more likely that the developer will asks the public to defray some of his cost for the estimated $500 million buildings. No such requests are known yet.

Bramble's aspiration is to make his new design truly "authentic Baltimore" and be such that everyone has access and feels comfortable there. The open spaces along with the envisioned amphitheater may well be able to deliver on this principle. 

However, the same will be nearly impossible to achieve with those massive residential towers right at the waters edge or a new office cube squeezed in between the WTC and the amphitheater. The total development footprint will be so much larger than that of the existing pavilions that it will be very hard to avoid the pitfalls of the pavilions which Bramble mentions all the time, namely that they are creating uninviting walls against the streets, and that they were too corporate. His office cube sits on stilts and the residential tower are supposed to have "see through" first floor retail, but that will not prevent them to be entirely private for-profit developments, quite like everything else in the "outer frame" and quite unlike anything else in the "inner frame" which to date is characterized by public open spaces and attractions. (The WTC is publicly owned by the State).

The full view from the northwest (Rendering MCB)

Knowing that Bramble would go up in height and add lots of apartments to his mixed use development, one could have expected ultra-slim, but tall towers, as they define Vancouver's waterfront and can also be found in Manhattan. Instead the design shows two 25 story and 32 story slabs with solid facade grids which are angled to each other and connected via a roof garden. They definitely will cut off many of the views from behind.

We "won't accept the binary between downtown and the neighborhoods", the Governor stated today. For it to be "Baltimore's time" he continued, it all needs to be done: housing, the Inner Harbor, the Convention Center and the Oriole's deal. An ambitious agenda, indeed. 

No matter that many Baltimore locals have turned their back on HarborPlace in the recent decade or so, this new proposal will certainly create strong reactions, pro and con. After posting today's renderings on my Facebook page, comments range from admiration condemnation and everything in between.  It will remain to be seen how the politicians will weather the storms that will certainly come and how much of the design will survive once regulations, cost and funding have been further explored. 
As far ans waterfronts, we already have Fells Point (historic), Harbor East and Harbor Point (ultra modern).   HarborPlace will have to find a new identity somewhere in between. Not an easy task. 

(See a full set of renderings at https://www.ourharborplace.com/theplan)

Klaus Philipsen, FAIA

the article has been updated as additional information became available. A mistaken attribution of the design responsibilities to the various firms has been corrected. Unknown Studio of Baltimore designed all open spaces of the project, including the streetscapes.

View of the "Sail" building designed by Danish architects (MCB rendering)


Floating wetlands in front of the cube building on Pratt Street  designed by
Unknown Studio (MCB rendering)





Thursday, October 26, 2023

Baltimore could have had this

What could have been

Even on this grey fall afternoon, they stood out as new and shiny among the somewhat tired looking neighbors: Two new office towers, over 300' tall,  a million square feet each, with fifty thousand square feet of first floor retail and a pre-school backstopped by a 1.2 care park designed by Field Operations,  Opened early this year, this explosion of new office space in a time of international office malaise and vacancy is like a small miracle. As we will see in a moment, all this could have been in Port Covington, where some forlorn new office buildings face their own uncertain future. Instead, the project rose in Crystal City. What is Crystal City like?

Merlin and Jasper (Photo: ZGF website)

Crystal City

It is an office satellite with Metro access located in Arlington County, across the Potomac from the District of Columbia. Not bound by the height restrictions and the many bureaucratic hurdles of the nation's capital, Crystal City began to flourish as an office monoculture right around the time when the DC Metro system opened. Unlike several other Arlington County subway stops, this one wasn't conceived as a mixed use transit oriented development. Instead, the place was fueled by the nearby Pentagon. More Gunpowder Hill than Silicon Valley. 

The U.S. Patent Office and the Institute of Defense Analysis established offices in Crystal City in the late 1960s. The Crystal City Metro Station opened in July 1977 and the Virginia Railway Express (VRE) station opened a few years later. Millions of square feet of mixed-use development have been built to date, making this region a primary activity center. (County website)
Crystal City and Pentagon City are mashed together, the latter another Metro stop, a mall and shopping mall. 
Piling it on in Crystal City, dense but not
beautiful (Photo: Philipsen)

[in 1976] the County Board approved the Pentagon City Phased Development Site Plan (PDSP) to provide for mixed-use development focused around the Pentagon City Metro Station. The plan included: more than 1.5 million square feet of office/commercial space; 1,600 hotel rooms; 5,450 dwelling units including a nursing and retirement home; open space and regional shopping facilities.
When the base realignment BRAC rolled around in 2006 the Baltimore region was the winner (Fort Meade was slated for growth) and Arlington County lost steam.  Many defense oriented contractors and firms left. 

The pandemic, the new trend of working from home that leaves so much office space unoccupied and the growing online shopping didn't bode well either for these two office and airport hotel burgs on the Potomac, no matter that they feature several condo towers from which one one can see the National Mall and watch the airplanes land at the nearby National Airport. The twin conglomerates are not exactly known as the pinnacle of hipness. Most people know them from looking right when they get stuck on Route 1 on their way into DC. x for a hotel near the airport. There are 4600 rooms to chose from. 
Child-friendly: Playground and pre-school
(Photo: Philipsen)

But then two miracles happened and the cluster now re-baptized as National Landing became the envy of the nation. First in 2018 it became the winner the of a national competition that included 238 US cities and was called the  "Hunger Games" by Wired Magazine and then in 2022 some of the defense glory came back wit Boeing declaring that it moved its headquarters here from Chicago.

Baltimore

Baltimore was one of the contestants in the "Hunger Games that had promised 50,000 jobs. With Port Covington Baltimore offered what seemed a very plausible location. The reader will have guessed by now that we are talking about Amazon HQ2, the corporate plum that made mayors salivate all across North America. In a true Cinderella story, Arlington County and the State of Virginia landed the winning bid, in spite of their comparatively puny half  billion dollars of incentives. Baltimore was so soundly rejected that as the only large East Coast City it didn't even make it into the final round.

"The HQ2 project will be — in the right place — an opportunity for true urban revitalization and community invigoration. Establishing its headquarters in Baltimore, a majority African American city, is a public statement of Amazon's investment in diversity and inclusion," (Baltimore Pitch)

Two questions arise: 1. What did Crystal City have that Baltimore didn't and 2. how do things in Crystal City look five years later? Let's begin with the second question.

So how did things turn out for Crystal City?

For starters, Arlington County had to split the Amazon bonanza with Queens, New York. Then Amazon canceled the New York portion of the deal and began building slightly over 2 million square feet as phase 1 in the area now rebranded as "National Landing". For comparison, the full build out of HarborPoint in Baltimore foresees about 3 million square feet of development. As of now only 8000 employees work in the two buildings that are now completed and could accommodate about 14,000 workers. Phase 2 of the the Amazon development, the double helix is on pause for the time being. Surprisingly, Arlington has not yet paid any of the incentive money which it had wisely tied to the improvements Amazon had promised and the State had not yet paid anything either as of March of this year.

A new name is not yet a new "city"

The two 22 story 300' tall office buildings (Merlin and Jasper) together form what is called MetPark. The footprint could easily have fit into Port Covington which already features similar structures, although not quite as fancy. On first blush the two buildings look like Siamese twins except that the local fire department cut the connection of the two third level roof decks about the two lobbies. 

The buildings are quite green: They are scheduled to receive LEED Platinum certification for rainwater recycling, operable windows on all floors, bicycle parking, plenty of EV charging stations, some mass timber construction and a massive off site solar farm that is offsetting the large electric load the fully electrified building generates. Only the restaurants on the first floor refused to entirely get rid of gas and continue to use gas stoves in their commercial kitchens. 

The campus features everything a techie would want: A bike store, cool restaurants. Wide sidewalks with lush plantings, and protected bike lanes up front, a child care center with a beautiful outdoor space and even a dog park. (Even Amazon's offices are said to be dog friendly). The refurbished Metro Park on top of the garage was designed by Field Operations, the company which designed the Highland in NY and is also working on the Middle Branch masterplan realization. 

Amazon states on its own HQ2 website that it "made more than $161 million in donations and cash grants to local nonprofits and charitable organizations, and created over 2.5 acres of public park space." The offices don't look as futuristic as Apple's donut HQ but reflect the fact that office workers want experience and that could office buildings should be good urban neighbors. Access to the office cubicles


Generous sidewalks and planters designed by Field Operations
(Photo: Philipsen)
that few are allowed to visit  begins on the second floor of each tower with a three-story zone that Amazon calls “Center of Energy”. This "distribution level" is conceived as a gathering and communication space for the workforce. The general public, meanwhile is allowed to enter the two main lobbies which are oriented to the park and towards each other and not the street. This allows maximal retail frontage along the front. There is also a 700-person event space constructed with glulam beams. It is open for public use by the local community. The buildings were designed by ZGF Architects, the interior design was created by Gensler Architects.

In spite of these many attractive results, it is sobering to see, that  five years after the decision, only less than 25% of the promised HQ2 jobs have actually realized and some would say that phase 2 is not certain. 

Should Baltimore mourn the loss? Port Covington continues to develop, the loss of Amazon, the shrinking Under Armour HQ and a dead office market notwithstanding. For a while people wondered why Baltimore didn't even make the shortlist, then moved on. Everyone had their favorite explanation from crime to schools and from lacking transit to a lack of a well trained workforce.  Baltimore's chief business attractor, Bill Cole of BDC hinted that the last reason may have been the decisive factor. 

2.5 acres of park in the back.
(Photo Lucas Jensen/Amazon)
"What we have heard repeatedly from them both in our exit call is that they are looking for a place that is tech-talent ready to go on day one. What they said was, 'You need to keep doing what you are doing to grow tech talent, focusing on STEM education, keep working with Johns Hopkins (University) to endure. You have tech talent in the region." Bill Cole, BDC

The lack of incentives couldn't have been it, even though it wasn't made public what they would have been. But Montgomery County, also vying for HQ2 made the cut either, in spite of $5 billion in incentives that Governor Hogan had put into the mix.  Who knows if Hogan's incentives would have been couched as cleverly as Virginia's which didn't have to pay up yet due to the metrics not yet having been met. Baltimore's assumption that Amazon's diversity problem and Baltimore's equity problem would find enough overlap was certainly wrong. ESG or not, if push comes to shove, a corporation will pick the white affluent well trained area over a poor, majority black city any day.

Access for all: The lobby (Photo: Philipsen)

There probably many lessons to learn from the HQ2 process. One is that it doesn't pay to participate in a game of "who can throw the most money after a profitable tech company". 

Amazon wouldn't have solved Baltimore's problem, nor does it solve Crystal City's lack of urbanity. For being a real and authentic city with an attractive quality of life, there is no silver bullet, no substitute for persistent and steady work.

Klaus Philipsen, FAIA

See also my articles about the City after the office on my compendium blog. 

Tuesday, October 17, 2023

Mind the Gap

"Show me a state that clicks on all cylinders and it’s largest city isn’t. For Maryland to thrive Baltimore needs to lead the charge. But the city can’t do it alone.”[...]
“Stop the binary. This is not about choosing between downtown or the neighborhoods. We can do both.” (Governor Moore at the Transportation & Economic Development Summit of the Greater Baltimore Committee on Monday)

Mind the Gap warning at the London Underground
(Hidden London)

Baltimore surely isn't running on all cylinders. Instead it is a city full of gaps and many disconnected actions and projects. That Baltimore's problem isn't the lack of good stuff, heroic actions and beautiful projects but the lack of connectivity and coordination has long been a conviction of mine. 

In the 1990s when we discussed the state of the "city that reads" in the Urban Design Committee of AIA which I co-chaired, I often compared Baltimore to a burn patient. Healthy skin had been grafted on to extensive burns in the hope the patches would grow together. 

No lack of skin grafts, large and small: Charles Center, the Inner Harbor, Harbor East, Belvedere Square, Camden Yards, the Convention Center expansion. These operations go so far back, that some of the grafts shriveled themselves, far from being healthy islands that could spread. Some have been in the pipeline for so long that one wonder if they still have healing power, the "Superblock" and State Center come to mind. A lot more is in the pipeline as became evident at GBC's "summit". 

SUN headline on Sunday
(Photo: Philipsen)

The bottom line is that dereliction, abandonment or otherwise unpleasant stretches pockmark the City in all directions interspersed by the detritus of the car friendly city that disrupts the urban fabric: parking garages on and off ramps, freeways, turn-lanes, garage driveways, services bays, hotel port cocheres, loading docks and gas stations. It really isn't surprising that Baltimore's streets so often look devoid of people while they are congested by cars.

Finally the gaps have reached the front page of the Baltimore SUN which in its Sunday print edition featured the headline: "Future rests on filling the gaps" and bemoans that "gaps riddle downtown Baltimore." The articles continues: "Like many central business districts , it also struggles with crime, the loss of businesses, jobs and foot traffic".  

Then the story pivots to developer David Bramble who calls filling the gaps "connecting the dots", which, as the SUN attributes to "boosters" is critical to revitalizing downtown. "connections should exist among landmarks, from Harbor East and Harborplace to the stadium and casino district. to the Arena and the University of Maryland", the SUN quotes Bramble. "How do we connect all these things to drive investment in between them and create connectivity? You want it to feel like one connected district as opposed to pockmarked spaces". 

On Monday Bramble sits on the stage of a Convention Center ballroom and moderates three representatives  of the communities he met during his listening sessions about HarborPlace. He doesn't talk about his gap theory but has brought community members to the podium to share their Harborplace expectations. However, the entire GBC summit titled "transportation and economic opportunity" turned out to be an elaboration on the gap theory. 

GBC Summit on Monday
(Photo: Philipsen)

Panel after panel reports about the many projects underway in Baltimore,  transit oriented development (Lutherville in the County and Penn Station in the City), the Planned Red Line revival, to the plans that the Aquarium and the Science Center and the successful efforts of updating the Arena into a venue than can outperform Philadelphia. The discussion went on to the stadium upgrades and the plans to connect the Casino area north to the two stadia and east towards Sharp Leadenhall. All acknowledged that they need to work in concert, heeding Bramble's admonition that "developers must think beyond their own projects and collaborate on finding ways to connect attractions by improving pedestrian access, roadways, transit and safety". 

Connections and pedestrian access, of course, concern public facilities and require the popular public-private partnership arrangements. Indeed, Bramble's Harborplace pavilions sit on public ground. Based on the principle of better access Bramble has opened the discussions to include additional city owned lands including streets such as Pratt and Light Streets and the McKeldin Plaza. Taking space from these super wide roadways potentially allows for Harborplace solutions that involve a much larger area than today's pavilions occupy.

GBC's Monday "summit" featured enough of the "dots" around the waterfront that one could see how they could connect through good collaboration. The mere fact to have the disparate voices of the Aquarium, the Science Center, the Stadium Authority, the Arena and the Downtown and the Waterfront  Partnerships and the MTA all in one room was innovation progress. 

David Bramble (left) hosts a panel about HarborPlace
(Photo: Philipsen)

Some 25 years ago the AIA Urban Design Committee worked on connectivity in five downtown Baltimore districts. Ideas included an attractive walking loop that would draw people away from the waterfront up to Lexington Market over to the University of Maryland and back to the Convention Center; lowering the last mile of the JFX, and connecting Penn Station by covering a small part of the ditch in which the JFX runs. Penn Station, UM and even the Lexington market since then got large capital infusions and flourish or are promising to flourish soon. However, the connectivity is still lacking, often one has to traverse entire blocks to get to the next functioning patch, something that few are will to do, especially when public safety is no longer a given.

The Mayor, the Governor and the deputy Secretary of Transportation of DOT in DC all spoke up for Baltimore. They represent the powers that can fill the gaps. They all control or influence public spaces. They proclaimed to give Baltimore a shot in the arm for better connectivity, more equity, and access. As Governor Moore said, the stars have never been better aligned. This should be "Baltimore's moment".

Klaus Philipsen, FAIA

See also my article on the non-local blog about the future of downtowns:

From Cubicles to Community:  The City Beyond the Office (1of 2)

(all photos below from the GBC summit)


Planned Penn Station redevelopment
(Photo: Philipsen)





Planned floating planting island at the Aquarium Pier 5
(Photo: Philipsen)


Planned new green learning space outside the Science Center
(Photo: Philipsen)